Planning
Border, warehouse and line at one table.
The weekly line calendar, supplier departure times and border crossing windows were placed on one operations plan. The warehouse was positioned as a sequencing layer, not an LTL merge point.
Capacity, route and delivery window locked in one language. The plan could update without losing part identity.
European road lane plan and warehouse consolidation calendar created.