Oversized industrial cargo prepared for project transport

03 / Project

Machinery Export Project Move

For a CNC press export, site survey, route permits and port operations ran under one project coordination.

Year
2023
Route / Region
Bursa – Hamburg
Transport model
Project cargo + sea freight

Operation need

Measure, permit
and equipment together.

A CNC press from Bursa to Hamburg exceeded standard trailer dimensions. If route permit, crane and specialist trailer were not ready together, the loading window was missed.

When booking was taken before a site survey, port operation and road transport waited on each other.

Challenge
Permits, routing and equipment had to be ready together for oversized industrial equipment.
Scope
Oversized machinery, site survey, permits, crane and port operation

Planning

Site survey comes first.

Measure, ramp access and crane point were verified at the plant site. Route, bridge clearance and night-move permits were gathered in one project file.

Port operation and sea booking were not locked without site data.

Project move plan and route permit package prepared.

Transport model

Project + sea combination.

Project cargo + sea freight

Lowbed trailer from the plant; crane operation at the port quay; Hamburg arrival by ro-ro or breakbulk lane. Every step under one project coordination.

Equipment, permits and booking did not sit on separate lines; they moved in one package.

Coordination

Crane, trailer and port.

Crane operator, haulier and port agent moved in one operational language. Loading window, permits and equipment prep updated on the same plan.

When the route had to change — traffic, bridge or permit — the project file was read again.

Operation process

From survey to port.

  1. 01SUR

    Site survey

    Measure, ramp and crane point verified.

  2. 02PRM

    Permits

    Route and night-move approvals obtained.

  3. 03EQP

    Equipment

    Lowbed trailer and crane booked.

  4. 04LOD

    Loading

    Plant exit and port transfer.

  5. 05SEA

    Sea

    Hamburg arrival and discharge planned.

Delivery / Outcome

Project cargo coordinated.

The CNC press moved in one project package from plant exit through port operation to the sea leg. Permits, equipment and booking closed in the same language.

Site survey, specialist trailers and route approvals were held in one project package.

Tangible outputs

  • Project move plan created
  • Route permit package completed
  • Project cargo coordinated

Operation gallery

Machinery Export Project Move

Project cargo survey and prep at a plant site
Site survey01
Oversized industrial cargo on a lowbed trailer
Project cargo02
Project cargo operation at port
Port operation03
Project transport convoy on route
Road lane04
Controlled container loading operations at a port

Quote

Let’s talk about your operation.

Share the measure, route and destination site. We build the project package together.