BUILD PROCESS

From first lineto open water.

A PRUVA is not made from a single drawing. It is made from decisions that follow and check one another.

Open water
  1. 01

    Concept

    Purpose, scale and the living scenario become clear. The character of the platform is set here.

  2. 02

    Design Development

    Exterior, interior and the overall room deepen under one language. Proportion tightens.

  3. 03

    Naval Engineering

    Hull, structure and systems are detailed as a whole that will work at sea.

  4. 04

    Construction

    Hull and superstructure take form in the workshop. Coordination comes before speed.

  5. 05

    Systems Integration

    The technical spine settles together with the living rooms. Every run is pulled with the next stage in mind.

  6. 06

    Interior Fit-Out

    Rooms are completed. Timber, surface, furniture and light become the visible face of the production discipline.

  7. 07

    Finishing

    Surfaces, paint and last details test the accuracy of every decision that came before.

  8. 08

    Sea Trials

    The yacht goes to sea. Performance, systems and use are assessed in open water.

  9. 09

    Delivery

    When the checks are complete, the yacht is released to the owner’s journey.