CONSTRUCTION & ENGINEERING

KAVRON

00

Solid work. Clear results.

Planned. Solid. On time.

Service ↘

Steel Structures

Erection tempo locks to the handover date.

Steel Structures

Steel is not left waiting on site. Pieces arrive in sequence from the shop; erection is written on the programme.

Span, fire and connection details lock before the drawing. Crane, crew and anchors run at the same pace; handover closes with the erection record.

Scope

Fabrication

Shop sequence locks to site tempo.

Erection

Crane and crew stay on the programme.

Acceptance

Bolts, welds and grid are measured on site.

Solution and planning

Erection tempo locks to the handover date.

  • Span decision
  • Delivery sequence
  • Erection record
  • Fire protection
Steel Structures

FAQs ↘

Locked before work starts

Does fabrication finish before site?

Critical grid comes first. Delivery follows the erection sequence.

How is fire resolved?

Protection and coating are written first. The decision is not left to erection.

Together with concrete?

Yes. Anchors, slabs and steel run on one programme.

New Project ↘

Your next projectstarts here.