Fabrication
Shop sequence locks to site tempo.
CONSTRUCTION & ENGINEERING
KAVRON
Solid work. Clear results.
Planned. Solid. On time.
Service ↘
Erection tempo locks to the handover date.

Steel is not left waiting on site. Pieces arrive in sequence from the shop; erection is written on the programme.
Span, fire and connection details lock before the drawing. Crane, crew and anchors run at the same pace; handover closes with the erection record.
Shop sequence locks to site tempo.
Crane and crew stay on the programme.
Bolts, welds and grid are measured on site.
Erection tempo locks to the handover date.

FAQs ↘
Critical grid comes first. Delivery follows the erection sequence.
Protection and coating are written first. The decision is not left to erection.
Yes. Anchors, slabs and steel run on one programme.