Controlled strip-out
Work is sliced without damaging the existing structure.
CONSTRUCTION & ENGINEERING
KAVRON
Solid work. Clear results.
Planned. Solid. On time.
Service ↘
We set the new programme without damaging the existing structure.

On an existing building, work is set while the volume stays open. Strip-out, strengthening and the new programme run with the same discipline.
Structure, MEP and the use scenario are read first. Dust, noise and access stay controlled; handover can also close in parts.
Work is sliced without damaging the existing structure.
The site is set so used areas stay open.
The new programme locks to the existing frame.
We set the new programme without damaging the existing structure.

FAQs ↘
Yes. The site is sliced; access and safety sit apart.
The existing condition is read first. Strengthening and strip-out stay in writing.
If needed it closes floor by floor or by zone. The programme is set for that from the start.