CONSTRUCTION & ENGINEERING

KAVRON

00

Solid work. Clear results.

Planned. Solid. On time.

Service ↘

Renovation

We set the new programme without damaging the existing structure.

Renovation

On an existing building, work is set while the volume stays open. Strip-out, strengthening and the new programme run with the same discipline.

Structure, MEP and the use scenario are read first. Dust, noise and access stay controlled; handover can also close in parts.

Scope

Controlled strip-out

Work is sliced without damaging the existing structure.

Live volume

The site is set so used areas stay open.

Functional conversion

The new programme locks to the existing frame.

Solution and planning

We set the new programme without damaging the existing structure.

  • Existing-condition survey
  • Safe strip-out sequence
  • Dust and noise control
  • Phased handover
Renovation

FAQs ↘

Locked before work starts

Can work run while the building is in use?

Yes. The site is sliced; access and safety sit apart.

How is structural risk handled?

The existing condition is read first. Strengthening and strip-out stay in writing.

Is handover one shot?

If needed it closes floor by floor or by zone. The programme is set for that from the start.

New Project ↘

Your next projectstarts here.