Kocaeli · 2024
Lighting, cooling and handling systems at a regional distribution centre draw heavily in daytime hours. A wide flat roof offers high installation efficiency without competing with yard activity.
The showcase covers phased rooftop delivery planned around the operation schedule, plus live performance monitoring after commissioning — structured for operational visibility rather than fixed economic claims.
The facility runs on a tight shipment rhythm. Energy use tracks handling peaks, cold-chain loads and lighting across long operating windows — but roof potential and transformer headroom were not mapped to that rhythm.
The objective was to turn unused roof area into a managed generation line, with monitoring that gives operations a clear view of output without disrupting yard or dock activity.
Align rooftop capacity to daytime consumption without interrupting shipment windows.
Preserve roof access, drainage paths and maintenance corridors in the layout.
Provide live production visibility and alarm thresholds after commissioning.
From load and roof discovery through EPC and monitoring handover — one coordination frame for a logistics warehouse environment.
Load & roof discovery
Hourly consumption profile, transformer capacity and roof structural limits read together before layout decisions.
Rooftop engineering & layout
Panel zoning respects access routes, drainage and fire-regulation corridors on a wide flat roof.
Phased EPC installation
Site work sequenced outside peak shipment windows to keep dock and yard operations uninterrupted.
Monitoring & handover
Line-level production tracking, alarm configuration and operations briefing at commissioning.
Capacity was set after structural and electrical discovery — not from roof area alone. Layout zones were defined around maintenance access before module count was finalised.
Installation was phased to match the warehouse calendar. Monitoring went live at handover so operations could read production alongside existing energy data, without contractual performance guarantees.

Discovery & feasibility
Load profile, roof survey and connection capacity documented in a single feasibility frame.
Engineering & zoning
Layout, cable routing and protection design aligned to warehouse access and safety requirements.
Phased EPC delivery
Module install and commissioning completed in stages coordinated with the operations team.
Monitoring handover
Dashboard access, alarm thresholds and maintenance documentation transferred to facility management.
The showcase outcome is a commissioned rooftop line with monitoring in place — giving the facility team a visible production reference alongside their existing energy management.
Phased delivery kept shipment windows intact. Roof corridors and maintenance paths were preserved in the final layout, supporting long-term access rather than maximising module count alone.
Showcase scenario — performance and economic outputs are illustrative only; not a commitment or guarantee.Phased EPC outside peak shipment windows
Live production dashboard with alarm thresholds
Maintenance corridors and drainage paths preserved
Commissioning documentation and monitoring briefing complete
Wide rooftop layout on a regional distribution centre in Kocaeli.
Share your warehouse type and operating hours — we will clarify capacity and delivery planning.

Share your facility type, target capacity and delivery expectations — we will outline a feasibility frame similar to these showcases.