18 Aug 2026

Planning Delta With the Line Live

18

AUG

2026

At Delta Production Plant the site was set while the line stayed live. Downtime risk locked first, then the work was sliced.

The critical line, temporary access and the handover date stayed on one desk. When drift appeared the list changed the same day; office and site spoke the same number.

Note points

Line protection

Production downtime was written on the programme from the start.

Access slice

Temporary road and dust locked to the line tempo.

Handover

Commissioning date ran the work list.

The plan did not stay on paper. The weekly update tied the plant and the site to the same line.

Held on site

Downtime risk was written first at the Çorlu plant. The programme was built to the line tempo.

  • Downtime risk written
  • Critical line first
  • Weekly update
  • Site and office, same number
Planning Delta With the Line Live