Line protection
Production downtime was written on the programme from the start.
CONSTRUCTION & ENGINEERING
KAVRON
Solid work. Clear results.
Planned. Solid. On time.
Planning ↘
18 Aug 2026

18
AUG
2026
At Delta Production Plant the site was set while the line stayed live. Downtime risk locked first, then the work was sliced.
The critical line, temporary access and the handover date stayed on one desk. When drift appeared the list changed the same day; office and site spoke the same number.
Production downtime was written on the programme from the start.
Temporary road and dust locked to the line tempo.
Commissioning date ran the work list.
The plan did not stay on paper. The weekly update tied the plant and the site to the same line.
Downtime risk was written first at the Çorlu plant. The programme was built to the line tempo.