On Trakya Line Works, office and site did not speak two jobs. Manhole level and asphalt ran on the same line.
When drift appeared the list changed the same day. Temporary traffic stayed under control until close-out; handover locked to operating access.
Office and site read the same programme.
Pipe and manhole came first.
Asphalt was laid at the same pace as the weir.
An update is not a meeting. It is a written decision and a site list.
In Çerkezköy, trench, manhole and asphalt locked to the superstructure tempo. The programme locked weekly.