Span
The rack axis set the frame.
CONSTRUCTION & ENGINEERING
KAVRON
Solid work. Clear results.
Planned. Solid. On time.
Technical ↘
21 Jul 2026

21
JUL
2026
At Atlas Logistics Centre the frame was written to the rack axis and fire crossing. The decision was not left to erection.
Steel erection bought speed; site concrete and the ramp locked to the same programme. Span, fire and the handover date stayed on one desk.
The rack axis set the frame.
Delivery locked to site tempo.
Crossing and protection were written first.
If the system waits until the last day, the site waits. The decision locks before the programme.
Span and fire locked before erection in the Gebze logistics hall. Steel or concrete was not chosen on site.