Controlled strip-out
Work was sliced without damaging the frame.
CONSTRUCTION & ENGINEERING
KAVRON
Solid work. Clear results.
Planned. Solid. On time.
Site ↘
11 Aug 2026

11
AUG
2026
On the Existing Plant Conversion the live volume stayed open. Strip-out, dust and access were set zone by zone.
Structure and MEP were read first. The snag list was written the same day; close-out was signed on site, not in the office.
Work was sliced without damaging the frame.
Phased close-out was written on the programme.
The file was signed on site.
Handover is not a last meeting. Measure, snags and the record finish in the same place.
Strip-out was sliced while the old plant stayed open. Handover closed by zone, with the record signed on site.
