Controlled strip-out
Work was sliced without damaging the existing frame.
CONSTRUCTION & ENGINEERING
KAVRON
Solid work. Clear results.
Planned. Solid. On time.
Renovation ↘
Tuzla · Istanbul

In Tuzla, strip-out and the new programme were set while the existing plant stayed live.
Structure, MEP and the use scenario were read first. Dust, noise and access stayed controlled; handover closed by zone.
Work was sliced without damaging the existing frame.
The site was set so used areas stayed open.
Function locked to the existing building.
Strip-out and the new programme were set while the live volume stayed open. Handover closed by zone.

Site ↘

