Facade protection
Stone and joinery stayed in place.
CONSTRUCTION & ENGINEERING
KAVRON
Solid work. Clear results.
Planned. Solid. On time.
Renovation ↘
Beyoğlu · Istanbul

Existing office in Beyoğlu. The facade was kept; the interior programme renewed floor by floor.
Scaffold, dust and access were sliced on a tight plot. Floors, services and plaster ran on one work list; handover was signed floor by floor.
Stone and joinery stayed in place.
Floor handover was measured the same day as services.
Scaffold and logistics locked to the street tempo.
The existing stone facade was kept. Interiors closed floor by floor; the site was set on a tight street.