Facade
The glass shell locked to the interior tempo.
CONSTRUCTION & ENGINEERING
KAVRON
Solid work. Clear results.
Planned. Solid. On time.
Commercial ↘
Tuzla · Istanbul

Showroom in Tuzla. Glass facade, mezzanine and hall closed at the same pace.
The use scenario locked to the vitrine. Steel stair, floor and lighting stayed on one desk; the opening date was the handover criterion.
The glass shell locked to the interior tempo.
Steel stair and hall were measured the same day.
Vitrine handover was written on the programme.
Glass facade, mezzanine and hall ran on one programme. Handover locked to the vitrine opening.

Site ↘

