Delta Production Plant

Çorlu · Tekirdağ

Delta Production Plant

In Çorlu the site was set while production stayed live. Handover was taken without stopping the line.

Temporary access, dust and noise were sliced to the line tempo. Steel, slab and MEP locked to the plant programme.

Work packages

Live line

The site was sliced without cutting production.

Plant slab

Machine axis and slab stayed on one desk.

Handover

The site closed as the line came online.

Site and handover

The site was set while the line stayed open. Handover was taken without stopping the line.

  • Line-protection plan
  • Slab and axis lock
  • Temporary access
  • Commissioning handover