Facade
The outer shell locked to the interior tempo.
CONSTRUCTION & ENGINEERING
KAVRON
Solid work. Clear results.
Planned. Solid. On time.
Commercial ↘
Maslak · Istanbul

On the Maslak office, facade, interiors and MEP ran at the same pace. Tenant handover closed floor by floor.
The use scenario locked to delivery. Common areas, office floors and the vitrine stayed on one programme; revisions moved in writing.
The outer shell locked to the interior tempo.
Floor handover was measured the same day as MEP.
Phased close-out was written on the programme from the start.
Facade, interiors and MEP held one tempo. Tenant handover closed in parts.

Site ↘

