CONSTRUCTION & ENGINEERING

KAVRON

00

Solid work. Clear results.

Planned. Solid. On time.

Infrastructure ↘

Trakya Line Works

Çerkezköy · Tekirdağ

Trakya Line Works

Line and road in Çerkezköy. Excavation, pipe and asphalt locked to the superstructure tempo.

Trench, manhole and drainage stayed on one desk. Temporary traffic stayed under control until close-out; landscape handover closed with a record.

Work packages

Line

Pipe and manhole sequence was written on the programme.

Road

Asphalt and weir were laid at the same pace.

Handover

It closed with access left open for operations.

Site and handover

Line, weir and road ran on one programme. Handover locked to operating access.

  • Trench programme
  • Manhole level
  • Asphalt handover
  • Drainage acceptance
Trakya Line Works

Site ↘

Project photos

Trakya Line Works — 3Trakya Line Works — 4

New Project ↘

Your next projectstarts here.