CONSTRUCTION & ENGINEERING

KAVRON

00

Solid work. Clear results.

Planned. Solid. On time.

Infrastructure ↘

Marmara Site Works

Dilovası · Kocaeli

Marmara Site Works

In Dilovası, ground, roads and drainage locked to the superstructure tempo.

Excavation, fill and site concrete ran on one desk. Temporary roads stayed open until close-out; landscape handover closed with a record.

Work packages

Site prep

Excavation and fill were planned with the superstructure.

Drainage

Lines and weirs locked to the main programme.

Access

The temporary road stayed under control until handover day.

Site and handover

Excavation, drainage and site concrete locked to the superstructure tempo. Access stayed under control until close-out.

  • Ground programme
  • Drainage coordination
  • Temporary access
  • Landscape handover
Marmara Site Works

Site ↘

Project photos

Marmara Site Works — 3Marmara Site Works — 4

New Project ↘

Your next projectstarts here.