Site prep
Excavation and fill were planned with the superstructure.
CONSTRUCTION & ENGINEERING
KAVRON
Solid work. Clear results.
Planned. Solid. On time.
Infrastructure ↘
Dilovası · Kocaeli

In Dilovası, ground, roads and drainage locked to the superstructure tempo.
Excavation, fill and site concrete ran on one desk. Temporary roads stayed open until close-out; landscape handover closed with a record.
Excavation and fill were planned with the superstructure.
Lines and weirs locked to the main programme.
The temporary road stayed under control until handover day.
Excavation, drainage and site concrete locked to the superstructure tempo. Access stayed under control until close-out.

Site ↘

