Steel erection
Span and rack axis locked to the frame.
CONSTRUCTION & ENGINEERING
KAVRON
Solid work. Clear results.
Planned. Solid. On time.
Industrial ↘
Gebze · Kocaeli

Logistics volume in Gebze. Steel, site concrete and the loading face ran on one programme.
Ramp axis, warehouse span and fire crossings locked first. Supply and crew stayed on one desk; handover closed to the opening with a record.
Span and rack axis locked to the frame.
Slab, ramp and external yard were poured at the same pace.
The opening date was written on the programme; drift closed on the spot.
Steel and concrete ran on one programme in the logistics hall. Handover locked to the operating opening.