Warehouse slab
Slab and rack axis were measured together.
CONSTRUCTION & ENGINEERING
KAVRON
Solid work. Clear results.
Planned. Solid. On time.
Industrial ↘
Hadımköy · Istanbul

Warehouse in Hadımköy. Site concrete, ramp and rack axis ran at the same pace.
Slab level, ramp slope and fire crossing locked first. Handover closed fit for inbound goods on the rack.
Slab and rack axis were measured together.
The loading face locked to the operating tempo.
External concrete and access closed with handover.
Site concrete, ramp and rack axis ran at the same pace. Warehouse handover closed fit for operations.

Site ↘

