
01 / First contact
Line reading
It is not assumed at a desk. Cycle, gates, and operator habit are measured on site.
- Work
- Existing transfer, safety envelope, I/O boundary, and stoppage habit are read on the floor. Cell, line, vision, or retrofit — which one is stuck becomes visible here.
- Output
- As-is line note: part path, lock points, downtime window, and neighboring interface.
- Decision
- Which job comes first. No quote is written until the scope draft is locked.





