SCADA screens in a control room looking onto a food hall

Projects / 04

The record does not
sit detached from the screen.

Changing the screens was not enough. Alarm, recipe, and batch record were read from the existing PLC vocabulary.

Project

Production Line SCADA Modernization

On the night shift in the Manisa food hall, the reason for a stop was being hunted on the line. Every signal went red; the batch record sat in a separate report.

We did not write the new SCADA as an empty showcase. Existing PLC tags were read in place. The names the operator already knew were not discarded.

Need

When alarms flood, the line cannot be read.

The request arrived as “new screens.” The real need was that a stop should not be mixed with cleaning.

  1. 01

    Everything is red

    The operator could not separate a real stop from a cleaning window.

  2. 02

    Batch is detached

    Traceability sat in a separate file; filling knew nothing of the record.

  3. 03

    Tags are scattered

    If the new software discarded the old names, the night shift would still hunt for the person who wrote them.

Approach

The existing language is read first.

Architecture was not drawn before the cabinet door opened. Translation started from the operator’s reset.

  1. 01

    Inventory

    I/O, alarm, and recipe were written in place.

  2. 02

    Hierarchy

    The screen was built at the simplicity the night shift can read.

  3. 03

    Staging

    Old and new were verified side by side. The line stayed in production through overlapping stops.

Application

Cabinet, screen, hall.

Operators in a control room looking onto a food hall
Control room
Open PLC cabinet in a food-hall corridor
Existing cabinet
Industrial HMI console with abstract process graphics
New layer

01 / 03

Scope

What locked on this job.

  1. 01

    Existing cabinet and tag inventory

  2. 02

    SCADA architecture and screen hierarchy

  3. 03

    Alarm simplification and access

  4. 04

    Recipe and batch traceability

  5. 05

    Changeover on staged, overlapping stops

SCADA console in the control room looking onto the food hall
Monitoring · shift

On site

The record sits in the control layer.

Recipe change stays on the HMI. Cleaning and production stops do not mix in the same list. The batch does not detach from the PLC vocabulary.

Services

Services used.

Related industry · Food
  1. 03

    PLC & SCADA

    Control software must belong to the night shift as well.

    Review
  2. 02

    Line Automation

    A running station is not a running line.

    Review
  3. 05

    Retrofit

    Sound mechanics do not have to be stripped out.

    Review

Result

The layer was renewed; the line was not scrapped.

We do not invent reporting speed or an OEE percentage. Delivery is a readable control layer.

  1. Integrated system

    SCADA is read from the existing PLC vocabulary.

  2. Commissioned solution

    Alarm hierarchy and shift record stayed in production.

  3. Process scope

    Recipe, cleaning, and batch sit in the same tag language.

Open PLC cabinet in a food-hall corridor

Projects

Talk with the engineering team.

A new line, an existing cell, or an ageing cabinet. Scope comes from the work on your line, not from a catalogue.

Full request form