01 · First contact
Technical file
The job does not start at the machine. Drawing, material, and tolerance set to be written sit on the same table. A missing box does not proceed to quote.

- Yapılır
- Drawing or STEP, alloy, quantity, and critical dimensions are marked. Ambiguous tolerance, material documentation, or unclamped surface is separated.
- Çıktı
- Clarified requirement package. Which box is critical and which is waiting is written.
- Karar
- Whether the file is sufficient for quote, or which line stops with the customer.






